Statistical Process Control Routine
The measurement is entered once and the chart draws itself. Trend rules fire an alert before the part goes out of specification — and the engineer spends time analyzing, not building charts.
I want SPC without spreadsheetsIndicators generated
- 01Cp / Cpk per characteristic
- 02Trend alerts handled
- 03Scrap and rework by cause
Every indicator comes from the record made at the workstation — no manual consolidation, no intermediate spreadsheet.
What the routine does
- Measurement plan per critical characteristic
- Control charts generated in real time
- Alerts on trend rules and out-of-control points
- Capability by product, machine and period
Who uses it
- Operator — measures at the defined frequency
- Quality technician — handles the alert
- Process engineering — analyzes capability
Demo
Want to see this routine running with your process?
We set up a demo of the Statistical Process Control Routine using your forms, your indicators and your shift structure — so you can evaluate it with data you recognize.
Schedule a demoHow many hours a month does your team spend building charts?
Bring one critical characteristic. We model its chart and alert rule in PMQ+.
Other routines